Basement Waterproofing Calculator

Results

  • Wall Area: 0 sq ft
  • Material Cost: $0
  • Labor Cost: $0
  • Additional Systems: $0
  • Total Cost: $0

Waterproofing Technology

Comprehensive technical specifications for basement waterproofing systems and materials.

  • Membrane Systems
    • Thickness: 40-60 mil
    • Tensile Strength: 1,500 psi
    • Elongation: 300-500%
    • Hydrostatic Resistance: 100 psi
    • Vapor Permeance: 0.1 perms
    • Chemical Resistance: pH 3-11
  • Crystalline Systems
    • Penetration: 2-3 inches
    • Compressive Strength: 7,000 psi
    • Water Pressure: 460 ft head
    • Set Time: 2-4 hours
    • Bond Strength: 400 psi
    • Coverage: 1.5 lb/yd²
  • Drainage Components
    • Flow Rate: 18 gpm/ft
    • Compressive Strength: 15,000 psf
    • Core Type: Dimpled HDPE
    • Filter Fabric: 4.5 oz/yd²
    • Transmissivity: 21 gpm/ft
    • Service Life: 50+ years

Installation Standards

Critical specifications for proper waterproofing system installation:

  • Surface Preparation
    • Concrete Cure: 28 days min
    • Surface Profile: CSP 3-5
    • Moisture Content: <4%
    • Crack Treatment: >1/16"
    • pH Level: 7-9 optimal
    • Temperature: 40-90°F
  • Application Methods
    • Primer Coverage: 200-300 ft²/gal
    • Membrane Overlap: 6 inches
    • Corner Treatment: 2" radius
    • Termination Bar: 6" o.c.
    • Protection Board: 1/8-1/4"
    • Drainage Mat: 1/2" min
  • Quality Control
    • Film Thickness: ±10%
    • Adhesion Test: 3.0 N/mm²
    • Holiday Testing: 100V/mil
    • Water Testing: 24 hours
    • Documentation: ASTM D5957
    • Inspection Points: 12 min

System Performance

Key specifications for waterproofing system effectiveness:

  • Environmental Factors
    • Groundwater Level: -4 ft min
    • Soil pH Range: 5-8
    • Frost Depth: Local code
    • Radon Resistance: Class A
    • UV Exposure: 30 days max
    • Chemical Exposure: Class C
  • Drainage Design
    • Pipe Size: 4" minimum
    • Slope: 1/8" per foot
    • Sump Capacity: 25 gal/min
    • Filter Fabric: AOS 70-100
    • Gravel Layer: 12" depth
    • Cleanout Access: 50' max
  • Maintenance Requirements
    • Inspection: Semi-annual
    • Pump Testing: Quarterly
    • Drain Cleaning: Annual
    • Seam Check: 2 years
    • Recoating: 10-15 years
    • System Life: 25-30 years