Attic Insulation Cost Calculator

Insulation Material Science

Comprehensive technical specifications for attic insulation materials and performance metrics.

  • Fiberglass Batts
    • R-Value: 2.9-4.3 per inch
    • Density: 0.5-1.0 lb/ft³
    • Fire Rating: Class A (ASTM E84)
    • Sound Absorption: NRC 0.95-1.15
    • Vapor Permeance: 50+ perms
    • Cost Range: $0.64-1.19/ft²
  • Blown Cellulose
    • R-Value: 3.2-3.8 per inch
    • Density: 2.2-3.0 lb/ft³
    • Settling: 15-20% long-term
    • Recycled Content: 82-85%
    • Fire Retardants: Boric acid/ammonium
    • Cost Range: $0.98-1.58/ft²
  • Spray Foam (Open Cell)
    • R-Value: 3.5-3.7 per inch
    • Density: 0.4-0.5 lb/ft³
    • Air Barrier: Yes at 3+ inches
    • Expansion Ratio: 100:1
    • VOC Content: <50 g/L
    • Cost Range: $1.25-2.25/ft²

Installation Parameters

Critical specifications and requirements for proper installation:

  • Coverage Requirements
    • Depth Markers: Every 300 ft²
    • Batt Compression: <1% allowed
    • Vapor Barrier: 0.1 perm rating
    • Ventilation Baffles: 1" min clearance
    • Junction Box Clearance: 3"
    • Light Fixture Dams: 24" diameter
  • Labor Considerations
    • Installation Rate: 600-800 ft²/day
    • Crew Size: 2-3 technicians
    • Equipment Setup: 45-60 minutes
    • Material Prep: 30-45 minutes
    • Quality Checks: 15% of total time
    • Cleanup: 60-90 minutes
  • Safety Protocols
    • PPE Requirements: Full suite
    • Ventilation: 6-8 ACH minimum
    • Temperature Range: 40-100°F
    • Humidity: <70% RH
    • Fire Safety: Class 1 rated
    • Fall Protection: Required >6ft

Cost Analysis Factors

Detailed breakdown of cost components and considerations:

  • Material Cost Factors
    • Bulk Density Impact: ±15%
    • Coverage Factor: 1.15 typical
    • Waste Allowance: 8-12%
    • Regional Variance: ±25%
    • Volume Discounts: 10-15%
    • Seasonal Pricing: ±20%
  • Labor Cost Components
    • Base Rate: $45-75/hour
    • Overhead: 35-45%
    • Insurance: 12-18%
    • Equipment: $150-300/day
    • Travel Time: $0.58/mile
    • Setup/Cleanup: 15% of labor
  • Long-term Economics
    • Energy Savings: 15-25%/year
    • ROI Period: 3-7 years
    • Lifespan: 20-30 years
    • Maintenance Cost: $0.10/ft²/yr
    • Property Value: +2-5%
    • Tax Credits: Up to 30%